NJDOT Contract # 058960135, Fed. Proj. # NH-0033(259)
Amount: $44,470,476.74
Scheduled for completion in 2009. This project includes major utility repairs/
replacements including replacement of gas mains, separation of sanitary
and storm sewer systems, and new signalization at intersections. Rt. 1 & 9
is being widened to include 11’ to 12’ lanes as opposed to the
existing substandard lane widths.
The existing pavement suffered from significant
deterioration, therefore the concrete base course is undergoing major repair
work and the asphalt leveling and surface courses are being completely replaced.
A new ramp has been constructed directing traffic from Rt. 1 & 9 NB
to Granton Avenue.
This required blasting to remove several thousand cubic
yards of rock. As all site soils are considered contaminated, this project
requires the disposal of many thousands of cubic yards of soil in an environmentally-friendly
manner. In addition, a retaining wall is scheduled for replacement and two
landscape walls have been built.
|